Sunny Coast Bathroom Renovations

What Does a Bathroom Renovation Actually Cost in 2026?

By SCBR Studio · Planning

The honest answer: it depends — but here is a real framework

If you have searched "bathroom renovation cost" and come away more confused than when you started, you are not alone. Quotes range from $8,000 to $80,000 and no one seems to explain why.

This post gives you a grounded, tier-by-tier breakdown based on what renovations actually cost on the Sunshine Coast in 2026 — including what drives the price up, what you can control, and what you should never cut corners on.


The three tiers of bathroom renovation

Tier 1 — The Essential Refresh: $15,000 – $20,000

This tier suits a small bathroom (typically under 5m²) where the layout stays the same and the focus is on updating the look rather than reconfiguring the space.

What is typically included:

  • Replace vanity, tapware and toilet suite
  • Retile shower recess (keeping existing footprint)
  • New shower screen or curtain
  • Repaint walls and refresh silicone
  • Basic lighting update

What is not included:

  • Moving plumbing or drainage
  • Replacing waterproofing membrane (though this should always be inspected)
  • Structural changes or layout reconfiguration
  • Premium or imported fixtures

Best for: Investment properties, secondary bathrooms, or homeowners with a tight budget who want a meaningful cosmetic improvement.


Tier 2 — The Full Mid-Range Renovation: $25,000 – $35,000

This is the most common renovation category on the Sunshine Coast. It covers a full strip-out and rebuild of a standard-sized bathroom (5–8m²), with quality Australian fixtures and a considered design.

What is typically included:

  • Full strip-out of existing bathroom to bare walls and floor
  • New waterproofing to AS 3740 (non-negotiable in Queensland)
  • Full retile — floor, walls and shower recess
  • New vanity, tapware, toilet, shower screen and accessories
  • Updated plumbing (same general layout, minor repositioning)
  • New lighting and exhaust fan
  • Design consultation and project management

What pushes you toward the upper end of this range:

  • Larger format tiles (more cuts, more labour)
  • Floor-to-ceiling tiling
  • Freestanding bath addition
  • Niche installation in the shower
  • Heated towel rails or underfloor heating
  • Premium tapware brands (Brodware, Astra Walker, Habo)

Best for: The family main bathroom or ensuite in an owner-occupied home where longevity and quality matter.


Tier 3 — The Premium Custom Bathroom: $40,000 and above

Premium renovations are defined by custom design, high-specification materials and a level of craftsmanship that is built to last decades.

What sets this tier apart:

  • Bespoke joinery (custom-built vanities, shaving cabinets, storage)
  • Imported or stone tiles (Calacatta marble, large-format porcelain slabs)
  • Walk-in shower with frameless glass and linear drain
  • Freestanding bath with floor-mounted tapware
  • Smart fixtures (in-wall cisterns, sensor lighting, heated floors)
  • Architect or interior designer involvement
  • Longer build timelines with more detailed project management

Upper end of the range ($60,000–$80,000+) typically involves a larger bathroom (9m²+), full ensuite and bathroom renovation done simultaneously, or high-end imported materials with long lead times.

Best for: High-end owner-occupied homes, knockdown-rebuilds, luxury investment properties, or a master ensuite designed as a long-term retreat.


The biggest cost drivers — explained

Understanding what drives the price helps you make smarter decisions about where to spend and where to save.

1. Waterproofing

In Queensland, waterproofing must comply with AS 3740 and be carried out by a licensed waterproofer. This is not where you save money. A failed membrane means water damage to structure, subfloor and neighbouring rooms — repairs that cost far more than the waterproofing itself. Budget $1,500–$3,000 for a properly done job.

2. Tiling labour

Tiling is one of the most labour-intensive trades in a bathroom renovation. Large-format tiles, diagonal lays, feature walls and complex cuts all add hours. Expect $60–$100 per m² for labour alone, separate from the tile cost.

3. Plumbing

Moving a toilet, shifting a shower drain or repositioning a vanity all require a licensed plumber and can involve concrete cutting — which adds cost and time. If you can keep plumbing in place, you save significantly.

4. Fixture and tile quality

The gap between a $300 vanity from a box retailer and a $2,500 custom-built piece is real — in longevity, finish quality and how the room feels. The same applies to tapware. Budget for quality where it is touched daily.

5. Access and site conditions

Older homes on the Sunshine Coast — particularly in hinterland areas and older Caloundra or Buderim neighbourhoods — can present subfloor surprises: rot, asbestos sheeting, or inadequate drainage falls. A contingency of 10–15% of your total budget is sensible.


What is not included in most quotes

Be sure to ask your contractor what is and is not covered. Common exclusions include:

  • Asbestos removal (requires a licensed removalist — budget $1,500–$4,000 if suspected)
  • Structural repairs discovered during strip-out
  • Painting of the entire bathroom (sometimes quoted separately)
  • Towel rails, mirrors and accessories (often client-supplied)
  • Skip bin hire
  • Building permits if required

How to get an accurate quote

The most reliable way to get a quote you can actually rely on is:

  1. Have a clear brief — know your approximate tile choices, fixture preferences and whether the layout is changing
  2. Get a site inspection — a good renovator will want to see the space before quoting
  3. Ask for a detailed line-item quote — not a single lump sum
  4. Understand what is provisional — PC (prime cost) items like tiles and tapware are often estimated; the final figure can shift if you upgrade
  5. Check QBCC licensing — any contractor doing building work over $3,300 in Queensland must hold a current QBCC licence

Sunny Coast Bathroom Renovations — what we offer

We work across Noosa, Maroochydore, Caloundra, Buderim, Mooloolaba and the Sunshine Coast Hinterland. Our projects sit primarily in the mid-range to premium tiers, and we offer a complimentary photo assessment so you can get a ballpark estimate before committing to a full consultation.

If you are ready to get a clear number for your bathroom, get in touch or call us on 07 5391 4280.


Frequently Asked Questions

How long does a bathroom renovation take?

A standard mid-range bathroom renovation typically takes 2–4 weeks on site, once materials are on order. Premium renovations with custom joinery or imported tiles can take 6–10 weeks from start to finish, including lead times.

Do I need council approval for a bathroom renovation in Queensland?

Most bathroom renovations — like-for-like replacements or internal refits — do not require a development approval. However, if you are moving walls, adding a new wet area or making structural changes, a building permit may be required. Your contractor should advise, or you can check with your local council.

Can I live in my home during a bathroom renovation?

Yes, in most cases. If you have a second bathroom, the disruption is manageable. If it is your only bathroom, discuss timing and temporary arrangements with your contractor before work begins.

Is it worth renovating a bathroom before selling?

Generally yes — bathrooms are one of the two rooms (alongside kitchens) that most influence buyer perception and sale price. A well-executed mid-range renovation on the Sunshine Coast can return more than its cost at sale, particularly in the current market.

What is a PC item in a bathroom quote?

PC stands for Prime Cost. These are allowances in a quote for client-selected items — tiles, tapware, vanities — where the final price depends on what you choose. If you select items above the PC allowance, the quote adjusts upward. Always clarify PC amounts before signing.

Do you offer fixed-price contracts?

We provide detailed fixed-price quotes for the scope of work agreed. Variations (unexpected site conditions, client-requested changes mid-build) are handled through a formal variation process with your approval before any additional cost is incurred.

Tags: cost guide, bathroom renovation, Sunshine Coast, budgeting, 2026, planning